The real cost of a stalled application control project
A half-finished application control rollout is the most expensive kind there is. The budget is spent, the posture has not moved, and the meter is still running.
Empowering Microsoft WDAC
WDACManager Blog
Practical guidance on WDAC, Intune ACfB, Application Abstraction, policy lifecycle design, and controlled enterprise rollout.
4 posts in Essential Eight
This archive supports navigation and internal linking.
A half-finished application control rollout is the most expensive kind there is. The budget is spent, the posture has not moved, and the meter is still running.
The ASD PDF is short, but ML3 delays usually come from manual operations. With the right model, six months is realistic.
Antivirus blocks known bad. Application control blocks everything unauthorised. Both are essential, but only one is treated as a must-have, and the gap is not about technology.
Essential Eight and E8 expectations are easy to state but harder to operationalise without disciplined WDAC policy lifecycle management.